Design Focus
Lost in all the mumbo jumbo? No problem. Here’s a breakdown of what this project has added to the space/our design focus in one digestible pie chart. Hover over each section to see the measurements in square metres.
This Project in Numbers
368
Proposed Trees
4855 m²
Planting Beds/Permeable Landscapes
220 m²
Green Infrastructure
1015 m²
New Public Gathering Spaces
1015 m²
Outdoor Social Amenities
380 m²
Bike Lane/Mixed-Use Paths
01 // Planning + Programming
While the working project is separated into phases, the lots that comprise Phase 3 are tied together via park space, pathways, materiality and landscape design thematics. Overall, the landscape design intent for these Phases of Waterfront Landing is to create a welcoming, safe and pedestrian-friendly multi-family neighbourhood, inspired by the surrounding coastal rainforest thematic with lush vegetation, wood and stone. Activated public spaces, flexible-use pocket parks, and rain water management are all key drivers for the landscape design of the entire site.
02 // Visualization and Collaboration
The proposed buildings are framed with a mixture of coniferous and deciduous trees, native planting beds and boulder outcrops to mitigate grade changes. The on-site pathway network, coupled with three distinct social gathering nodes and greenspaces, offer a range of activities for residents to create a distinct, 'community' feel for the site. In addition, this network connects with perimeter nodes to provide easy access to the larger system of trails and parks within the Waterfront Landing development.
03 // Next Steps
Construction for Phase 3B/C will commence in Summer 2021 – please check back here for my updates as this landscape design starts to take shape.